The installation of the distribution center in Memphis. Montaze Broz did most of the racking in the building and also a mezzanine which had several levels from +650 mm until 14.550 mm and connected all systems.
Warehouse system
Pallet Racking
Number of hours
161 800
Number of workers
106
Weight
4,970 tonnes